Final Trim & Pavement Preparation
Our core trade, and the reason crews call us back. Kerb and pre-seal final trim graded to tight tolerance, with gravel placed and trimmed to spec, ready for kerb, asphalt or seal. The surface every other trade builds on, done right the first time so nothing gets pulled up and redone.
- Kerb and channel final trim
- Pre-seal and asphalt-course trim to spec
- Subgrade, road box and gravel layer preparation
- Kerb and concrete reinstatement
- Set-out from survey markings or first principles
- GPS and UTS machine-guided grade control